Applications Pending

112 Nokomis Road
Approval Not Required (ANR)

Laimis Balciunas submitted an application for a Form A Application For Endorsement of an Approval Not Required (ANR) plan under the Subdivision Control Law in Residence District A.

  1. Form A Application, dated July 13, 2022
  2. ANR Plan, dated October 17, 2022

136 Nokomis Road

Site Plan Review

Shadi Alallam submitted an application for Site Plan Approval with Waiver Requests under § I-I of the Zoning By-Law and such other relief as necessary to construct a 25X30 patio, install a stormwater drainage system and make other improvements at the property in the Residence A District.

  1. Site Plan Approval Application, dated September 9, 2022
  2. Site Plan, dated August 30, 2022
  3. Continuance and Extension Request, dated November 8, 2022

15 Howland Lane

Site Plan Review

Alex and Lauren Carabelli submitted an application for Site Plan Review with Waiver Requests under § I-I of the Zoning By-Law and such other relief as necessary to construct two additions, relocate a paved driveway, landscape, and hardscape in the Residence B District.

  1. Site Plan Approval Application Package, submitted October 27, 2022
  2. Site Plan, dated October 24, 2022
  3. Architectural Plans, dated August 19, 2022
  4. Stormwater Report, submitted October 27, 2022
  5. P. Brennan Peer Review Report, dated November 29, 2022

73 Abington Street

Site Plan Review Waiver and Special Permit A3 Modification

Gill Research Drive LLC submitted a request for a waiver of Site Plan Review under § I-I,9 and an application for modification of a Special Permit A3 Parking Determination under § V-A of the Zoning By-Law, to modify plans approved in connection with a Site Plan Approval and Special Permit A3 issued February 15, 2019, as extended, and such other relief as necessary to consolidate 3 approved office/warehouse buildings into 2, resulting the same approximate gross floor area, and make related improvements in the Industrial Park and South Hingham Development Overlay Districts.

  1. J. Tocchio Letter to C. Falvey, dated October 11, 2022
  2. Form 2 Application for Zoning Hearing, dated October 11, 2022
  3. Form 2D Application for Modification of a Special Permit A2, dated October 11, 2022
  4. Application for Modification of a Special Permit A3, dated October 11, 2022
  5. Supplement to Application for Modification of Site Plan Approval and Modification of Special Permit A3, dated October 11, 2022
  6. Plan Set, dated October 7, 2022
  7. Floor Plans and Elevations, dated October 7, 2022
  8. Stormwater Report, dated October 7, 2022
  9. Peer Review Comments from P. Brennan, dated November 3, 2022

Previous Decisions

  1. Site Plan Approval, dated February 15, 2019
  2. Special Permit A3, dated February 15, 2019

100 Industrial Park Road

Modify Site Plan Approval and Special Permit A3

Amazon submitted an application to modify the performance deadline to complete a traffic signal timing and phasing plan include in Condition E.1 of the Special Permit and Site Plan Approval decisions, dated April 29, 2021, permitting a Last-Mile Delivery Station to be located at the property in the Industrial Park and South Hingham Development Overlay Districts.

  1. A. Alberg Request for Modification Letter to E. Wentworth, dated October 13, 2022
  2. M. Kranzley Public Comment, dated November 6, 2022

Previous Decisions

  1. Notice of Decision, Site Plan Approval, dated April 29, 2021
  2. Notice of Decision, Special Permit A3, dated April 29, 2021

19 Whiting Street

Site Plan Review Waiver and Special Permit A3 Modification

Merhej and Sons Realty submitted a request for a waiver of Site Plan Review under § I-I,9 and an application for modification of a Special Permit A3 Parking Determination under § V-A of the Zoning By-Law, to modify plans approved in connection with a Site Plan Approval and Special Permit A3 issued December 14, 2020, and such other relief as necessary to add an additional pump island to the existing filling station in the Business B District and Accord Pond Watershed and Hingham Aquifer Protection Overlay District.

  1. J. Tocchio Letter to C. Falvey, dated October 11, 2022
  2. Form 2 Application for Zoning Hearing, dated October 11, 2022
  3. Form 2C, Special Permit A1, dated October 11, 2022
  4. Application for a Special Permit A-3, dated October 11, 2022
  5. Supplement to Application for Modification of Site Plan Approval and Modification of Special Permit A3, submitted October 11, 2022
  6. Site Plan, dated October 11, 2022
  7. Site Plan with Paved Area Calculation, dated October 11, 2022

Previous Decisions

  1. Site Plan Review Decision, dated December 14, 2020
  2. Special Permit A3 Decision, dated December 14, 2020

222 South Pleasant Street

Site Plan Review

CPC Pleasant Street LLC submitted an application for Site Plan Approval with Waiver Requests under § I-I of the Zoning By-Law and such other relief as necessary to raze and rebuild a single-family dwelling, two car attached garage, accessory building with one car bay and office, pool, pool house, tennis/sports court, hardscaping, landscaping and other improvements at the property in the Residence C District.

  1. Site Plan Approval Application Package, dated October 10, 2022
  2. Existing Conditions Plan, dated September 20, 2022
  3. Proposed Conditions Plan, dated September 19, 2022
  4. Site Plan Set, submitted October 10, 2022
  5. Stormwater Management Report, dated October 6, 2022
  6. Stormwater Management Analysis, dated September 20, 2022
  7. Grading Drainage and Utilities Plan, revised through October 20, 2022
  8. Site Plan, page 4, revised through October 20, 2022
  9. Stormwater Management Report, submitted October 20, 2022
  10. Updated Landscape Plan, submitted October 26, 2022
  11. Landscape Plan, revised October 28, 2022
  12. Landscape Plan in Color, revised October 28, 2022
  13. Response to L. Fournier Comments, dated October 31, 2022
  14. Stormwater Management Report, revised October 31, 2022
  15. Site Plan Sheet 1A, revised October 31, 2022
  16. Landscape Plan, revised November 2, 2022
  17. Responses to Staff Comments, dated November 21, 2022
  18. Plan Set, revised November 21, 2022
  19. Arborist Letter, dated November 29, 2022
  20. Existing Conditions Plan, revised November 30, 2022
  21. Layout and Materials Plan, revised November 30, 2022
  22. Utility Plan, revised November 30, 2022

Peer Review

  1. P. Brennan Peer Review Report, dated November 22, 2022

6 Oakwood Circle

Site Plan Review

Thomas Greeley submitted an application for Site Plan Review with Waiver Requests under § I-I of the Zoning By-Law and such other relief as necessary to reconstruct a single-family dwelling and make related improvements, including a new driveway, hardscaped patio and walkway, subsurface utilities, stormwater management systems, grading, and landscaping in the Residence C District.

  1. Site Plan Approval Application and Stormwater Materials, dated September 27, 2022
  2. Cut and Fill Plan, dated September 15, 2022
  3. Septic and Site Plan, dated September 27, 2022
  4. Architectural Plans, dated August 19, 2022
  5. Landscape Plans, dated September 27, 2022
  6. Updated Architectural Plan Set, submitted October 5, 2022
  7. Landscape Plan, revised through October 19, 2022
  8. J. Hassett Response to Peer Review Comments Letter to Planning Board, dated October 20, 2022
  9. Septic & Site Plan, revised through October 19, 2022
  10. Stormwater Analysis, dated October 20, 2022
  11. Architectural Plans, submitted October 20, 2022
  12. Septic and Site Plan, revised through October 28, 2022
  13. Site Plan, revised November 2, 2022

Peer Review

  1. P. Brennan Letter to Planning Board, dated October 14, 2022
  2. P. Brennan Updated Peer Review Comments to Planning Board, dated October 20, 2022

Worlds End
Request to Modify Special Permit A3 with Site Plan Review

Trustees of Reservations submitted an application for a modification of a previously approved Special Permit A3 with Site Plan Review Approval under §§ I-I, I-H and V-A of the Zoning By-Law and such other relief as necessary to modify the previously approved Traffic and Parking Management Plan for the property in the Official & Open Space District.

  1. Request for Modification Letter from Anne Smith-White, dated September 15, 2022
  2. The Trustees of Reservations, World's End Traffic and Parking Management Plan, revised through September 15, 2022
  3. Letter of Support from Hingham Traffic Sergeant, dated October 17, 2022
  4. Letter from C. Dittbrenner, dated November 1, 2022
  5. Letter from A. Smith-White, dated November 4, 2022
  6. Traffic and Parking Management Plan, revised November 7, 2022
  7. Worlds End Site Visit Notes, dated November 18, 2022
  8. Letter from A. Smith-White Regarding Updated Changes to Traffic and Parking Management Plan, dated November 18, 2022
  9. Traffic and Parking Management Plan, revised November 21, 2022

Previous Decisions

  1. Notice of Decision Special Permit A3 with Site Plan Review for the World's End Reservation Parking, Circulation and Amenities Plan, dated February 16, 2017
  2. Notice of Decision, Minor Modification to the Special Permit A3 with Site Plan Review for the World's End Reservation Parking, Circulation and Amenities Plan, dated October 30, 2019
  3. Traffic and Parking Management Plan, dated October 3, 2019

Public Comment

  1. T. Bright Email of Support, dated October 13, 2022
  2. P. Edmundson Email of Support, dated October 14, 2022
  3. L. O'Reilly Email Regarding Parking Management Plan, dated October 14, 2022
  4. L. O'Reilly Memo to Zoning and Planning Boards, dated October 14, 2022
  5. L. O'Reilly Proposed Edits to Traffic and Parking Management Plan, submitted October 14, 2022
  6. C. and H. Hidell Letter to Planning and Zoning Boards, dated October 14, 2022
  7. N. Bellows Email to Planning and Zoning Boards, dated October 16, 2022
  8. T. Graham Letter to J. Sneath and R. Maguire, dated October 13, 2022
  9. Lincoln Letter to Planning Board, dated November 4, 2022
  10. C. and H. Hidell Public Comment, dated November 4, 2022
  11. L. O'Reilly Public Comment, dated November 4, 2022
  12. J. McPhillips Public Comment, dated November 5, 2022
  13. L. O'Reilly Public Comment, dated November 16, 2022
  14. J. Maxwell Public Comment, dated November 18, 2022
  15. L. Tully Public Comment, dated November 19, 2022

107 Main Street
Request for Endorsement of an ANR Plan

Matthew Smith, Manager Dover Mills LLC submitted an application for a Form A Application For Endorsement of an Approval Not Required (ANR) plan under the Subdivision Control Law for property located at 107 Main Street in Residence District A.

  1. Form A Application, dated August 2, 2022
  2. Plan, dated August 2, 2022
  3. Email from D. Jordan Regarding ANR Filing, dated August 3, 2022
  4. Withdrawal Request, dated August 9, 2022
  5. Ellis Certification, dated August 22, 2022

261 Gardner Street
Form C - Application for Approval of Definitive Subdivision Plan

Joseph Cincotta submitted a Form C - Application for Approval of Definitive Subdivision Plan under the Subdivision Control Law and the Rules and Regulations of the Planning Board at the property in the Residence B District.

  1. W. Sullivan Letter to Planning Board, dated July 27, 2022
  2. Form C - Application for Approval of Definitive Subdivision Plan
  3. Plan Set, dated July 22, 2022
  4. Stormwater Management Report, dated July 2022
  5. Import-Export Analysis, dated July 8, 2022
  6. Foley Authorization Letter to J. Sneath, dated July 25, 2022
  7. C. Osinski Letter of Support to J. Sneath, dated July 25, 2022
  8. S. Sarni Memo to Planning Board, dated September 7, 2022
  9. W. Sullivan Continuance Request to Planning Board, dated September 14, 2022
  10. Definitive Subdivision Plan, revised through September 30, 2022
  11. Stormwater Management Report, revised through September 2022
  12. Weir River Water Supply Letter, dated September 13, 2022
  13. Hingham Light Cost Estimate Letter, dated August 4, 2022
  14. Fire Marshal Letter, dated October 18, 2022
  15. DPW Comments from R. Sylvester, dated October 24, 2022
  16. Stormwater Report, revised November 2022
  17. Sight Distance Letter, dated November 7, 2022
  18. Subdivision Plans, revised November 14, 2022
  19. Responses to Traffic Peer Review Comments, dated November 14, 2022
  20. Responses to Civil Peer Review Comments, dated November 14, 2022
  21. Responses to Staff Comments, dated November 14, 2022
  22. Subdivision Plans, revised November 15, 2022

Peer Review

  1. P. Brennan Peer Review Letter to Planning Board, dated October 11, 2022
  2. J. Dirk Traffic Peer Review Letter to M. Silveira, dated October 17, 2022
  3. P. Brennan Peer Review Letter, dated November 16, 2022
  4. J. Dirk Traffic Peer Review Letter, dated November 17, 2022

Preliminary Subdivision Decision

  1. Notice of Decision, dated May 26, 2022

55 Downer Avenue, Foster School

The Town of Hingham submitted an application for Site Plan Review under §§ I-I and III-B, 8.b. of the Zoning By-Law and such other relief as necessary to replace the Foster Elementary School with a new three-story 126,385 SF building along with related improvements at 55 Downer Avenue in the Official and Open Space District.

  1. Application for Site Plan Approval
  2. Project Overview Narrative, dated July 25, 2022
  3. Plan Set, dated July 25, 2022
  4. Drainage Report, dated July 18, 2022
  5. Operations and Maintenance Manual, dated July 18, 2022
  6. Traffic Narrative and Traffic Impact Analysis
  7. Memo from S. Murphy to Planning Board, dated August 22, 2022
  8. Updated Site Circulation Diagrams, received August 23, 2022
  9. Letter from A. Street to E. Sullivan E. Wentworth, dated August 24, 2022
  10. Stormwater Management Plan, revised August 23, 2022
  11. Site and Building Plans, revised August 23, 2022
  12. Operations and Maintenance Manual, revised August 23, 2022
  13. Memo from G. Tondorf-Dick to Planning Board, dated September 12, 2022
  14. Aerial Photo 
  15. Updated Plan Set, submitted September 21, 2022
  16. Traffic Impact Analysis, revised September 2022
  17. Traffic Impact Analysis Appendices, submitted September 21, 2022
  18. Delivery Truck Exhibit, submitted September 21, 2022
  19. Site Lighting Photometric Plan, submitted September 21, 2022
  20. Landscape Site Plan, dated September 21, 2022
  21. Stormwater Management Plan, submitted September 21, 2022
  22. Fire Truck Exhibit, submitted September 21, 2022
  23. A. Street Supplemental Response Letter to J. Sneath, dated September 21, 2022
  24. T. Brayton Response to Traffic Peer Review Letter to E. Wentworth, dated September 21, 2022
  25. Downer Ave Streetscape Section/Elevation, dated September 20, 2022
  26. A. Street Response to Member Comments Letter to J. Sneath, dated September 26, 2022
  27. Updated Plan Set, submitted September 26, 2022
  28. Materials and Landscape Plans, submitted September 26, 2022
  29. On-Site Queuing Diagram, submitted September 26, 2022
  30. Phase 3 Vehicular Site Circulation, submitted September 26, 2022
  31. Versa Lok Grande Wall Brochure, submitted September 26, 2022
  32. Versa Lok Grande Wall Details, submitted September 26, 2022
  33. Updated Streetscape and Narrative, submitted September 26, 2022
  34. A. Street Letter to J. Sneath, dated September 26, 2022
  35. Site Photometric Plan, revised through September 27, 2022 
  36. JR Frey Flood Elevation Memo to Planning Board, dated September 27, 2022
  37. Building Height Diagrams, submitted September 27, 2022
  38. R. Sylvester DPW Comments Email to E. Wentworth, dated September 28, 2022
  39. Responses to P. Brennan from A. Street, dated September 28, 2022
  40. A. Street Letter to J. Sneath, submitted October 11, 2022
  41. Tennis Court Diagrams, submitted October 11, 2022
  42. Landscape Plan Set, submitted October 11, 2022
  43. M. Scheufele and J. Newell Letter, submitted October 11, 2022
  44. Stormwater Management Plan, submitted October 11, 2022
  45. Updated Site and Building Plan Set, submitted October 11, 2022
  46. Updated Site Operations and Maintenance Manual, submitted October 11, 2022
  47. G. Tondorf-Dick Memo to J. Sneath, submitted October 12, 2022
  48. A. Street Letter to J. Sneath, dated October 19, 2022
  49. Site and Building Plans, revised through October 19, 2022
  50. Existing Conditions Survey, submitted October 19, 2022
  51. Illustrative Plan Updates, dated October 18, 2022
  52. Landscape Plan Set, dated October 17, 2022

Peer Review

  1. P. Brennan Peer Review Letter to Planning Board, dated July 28, 2022
  2. J. Dirk Peer Review Report, dated August 21, 2022
  3. P. Brennan Letter to Conservation Commission, dated August 29, 2022
  4. P. Brennan Letter to Planning Board, dated September 23, 2022
  5. P. Brennan Updated Peer Review Comments Email to M. Silveira, dated September 27, 2022
  6. J. Dirk Updated Traffic Peer Review Letter to E. Wentworth, dated September 29, 2022
  7. J. Dirk Updated Traffic Peer Review Letter to E. Wentworth, dated October 12, 2022
  8. J. Dirk Updated Traffic Peer Review Letter to E. Wentworth, dated October 21, 2022

Public Comment

  1. Public Comment from D. Nolan, dated August 9, 2022
  2. Public Comment from D. Nolan, dated August 19, 2022
  3. Public Comment from D. Nolan, dated August 23, 2022
  4. Public Comment from S. Thayer, dated September 12, 2022
  5. Public Comment from D. Nolan, dated September 25, 2022

Pre-Application Review

  1. J. Dirk Traffic Review Letter to E. Wentworth, dated July 7, 2022

335 Lincoln Street
Site Plan Approval and Special Permit A3 Parking Determination

Town of Hingham filed an application for Site Plan Review under § I-I and a Special Permit A3 Parking Determination under § V-A of the Zoning By-Law and such other relief as necessary to construct a new three-story ± 50,000 square foot public safety facility and other improvements in the Industrial District.

  1. Application for Site Plan Approval Cover Sheet, dated June 24, 2022
  2. Completed Checklist
  3. Contact List
  4. Submittal Requirements Checklist
  5. Project Description Letter from S. Schmigle to E. Wentworth, dated June 29, 2022
  6. Design and Performance Standards
  7. List of Supplemental Materials, dated June 24, 2022
  8. Civil Plans Set, dated June 24, 2022
  9. Architectural Plans and Elevations, dated June 24, 2022
  10. Logistics Plan
  11. Stormwater Management Report, June 24, 2022
  12. Application for Special Permit A3, dated June 24, 2022
  13. Memo from J. Dirk to S. Schmigle, dated June 20, 2022
  14. Transportation Impact Assessment, June 2022
  15. Electrical Lighting Fixture Schedule, dated June 9, 2022
  16. Lighting Specifications I
  17. Lighting Specifications II
  18. P. Brennan Peer Review Letter to Planning Board, dated July 14, 2022
  19. Illustrative Site Plan, revised through June 24, 2022
  20. Stormwater Management Report, revised August 2, 2022
  21. M. Laracy Response to Peer Review Letter to E. Wentworth, dated August 2, 2022
  22. Landscape Narrative, dated August 2, 2022
  23. Civil Plan Set, revised through August 2, 2022
  24. Lighting Plan, revised through August 2, 2022
  25. Landscape Plan, revised through August 2, 2022
  26. Landscape Details I, revised through August 2, 2022
  27. Landscape Details II, revised through August 2, 2022
  28. S. Schmigle Letter to E. Wentworth, dated August 2, 2022
  29. M. Laracy Letter to E. Wentworth, dated August 4, 2022
  30. Civil Plan Set, revised through August 4, 2022
  31. P. Brennan Updated Peer Review Letter to Planning Board, dated August 5, 2022
  32. Presentation to Planning Board, dated August 8, 2022
  33. Ellis Certification, dated August 22, 2022
  34. Wayfinding Signage Plan, dated August 23, 2022
  35. Response to Board Comments, dated August 25, 2022 
  36. Revised Parking Garage Layout, dated August 25, 2022
  37. Lower Level Turning Templates
  38. Main Level Turning Templates
  39. Building Elevations
  40. Civil Plan Set, revised through August 26, 2022
  41. Site Rendering Plan, revised through August 4, 2022
  42. Landscape Details II, revised through August 25, 2022
  43. Essington Elevation Options
  44. Garage Lower Level Floor Plan, received August 29, 2022

107 Main Street
Request for Endorsement of an ANR Plan

Matthew Smith submitted an application for a Form A Application For Endorsement of an Approval Not Required (ANR) plan, dated June 18, 2022, under the Subdivision Control Law for property located at 107 Main Street in Residence District A.

  1. Form A Application, dated June 21, 2022
  2. Plan, dated June 18, 2022
  3. Correspondence from Atty Sullivan, representing abutters, dated June 27, 2022
  4. Public Comment and Photos, received June 28, 2022
  5. Email Commentary, dated June 28, 2022
  6. ANR Exhibits, dated June 28, 2022
  7. Additional Email Commentary, dated June 28, 2022
  8. 1929 Plan of Land
  9. Additional Photos
  10. Second Set of Additional Photos

107 Main Street
Request for Endorsement of an ANR Plan

Matthew Smith submitted an application for a Form A Application For Endorsement of an Approval Not Required (ANR) plan, dated May 18, 2022, under the Subdivision Control Law for property located at 107 Main Street in Residence District A.

  1. Form A Application, dated June 14, 2022
  2. Plan, dated May 18, 2022
  3. Correspondence from Atty Sullivan, representing abutters, dated June 27, 2022
  4. Public Comment and Photos, received June 28, 2022
  5. Email Commentary, dated June 28, 2022
  6. ANR Exhibits, dated June 28, 2022
  7. Additional Email Commentary, dated June 28, 2022
  8. 1929 Plan of Land
  9. Additional Photos
  10. Second Set of Additional Photos

274 South Street
Site Plan Approval and Special Permit A3 Parking Waiver

The Town of Hingham filed an application for Site Plan Review under § I-I and a Special Permit A3 Parking Determination under § V-A of the Zoning By-Law and such other relief as necessary to construct a new pool complex including a 5,000+ SF bathhouse, fenced pool area, filtration structure, equipment storage building, equipment pad and other improvements at the South Shore Country Club, 274 South Street, in the Business Recreation District.

  1. Site Plan Approval Application, dated April 12, 2022
  2. Special Permit A3 Parking Determination Application, dated May 2, 2022
  3. Outdoor Pool Complex Parking Plan, dated March 17, 2022
  4. Stormwater Report and Operations and Maintenance Plan, dated January 5, 2022
  5. Parking Plan with EV Charging Spaces, dated May 2, 2022
  6. Plan Set, dated March 17, 2022
  7. P. Brennan Peer Review Letter to Planning Board, dated May 16, 2022
  8. J. Dirk Letter to M. Silveira Regarding Traffic Peer Review, dated May 16, 2022
  9. Photos, Views from Del Prete Drive
  10. Traffic and Parking Management Plan
  11. Site Plans, revised May 20, 2022
  12. J. Jackson Response to Peer Review Letter to M. Silveira, dated May 20, 2022
  13. J. Jackson Response to Traffic Review Letter to M. Silveira, dated May 20, 2022
  14. Fire Truck Turning Movements Plan, dated March 17, 2022
  15. Trash Truck Turning Movements Plan, dated March 17, 2022
  16. Memo to Planning Board from Neighbors Regarding Concerns , dated May 23, 2022
  17. Letter to Planning Board from Abutters, dated May 22, 2022
  18. K. Zick Letter to M. Silveira Regarding Tree Protection Plan, dated May 23, 2022
  19. Existing Tree Plan, received May 23, 2022
  20. Planting Plan, received May 23, 2022
  21. Memo from B. Homes to SITEC Regarding Review of Existing Conditions, dated February 12, 2021
  22. Existing Conditions & Wetlands Resource Area Plan, dated April 5, 2021
  23. J. Dirk Letter to M. Silveira Regarding Traffic Engineering Review, dated May 23, 2022
  24. Continuation and Extension Request, dated May 25, 2022
  25. Additional Peer Review Letter from P. Brennan to Planning Board, dated May 25, 2022
  26. Letter of Support from E. Congdon to E. Wentworth, dated May 30, 2022
  27. K. Smallcomb Email to E. Wentworth, dated May 31, 2022
  28. K. Forbes Email to E. Wentworth, dated June 2, 2022
  29. Fire Truck Vehicle Turning Movements, received June 6, 2022
  30. Western Lot Vehicle Turning Movements, received June 6, 2022
  31. Hydrant Access General Plan, received June 6, 2022
  32. Crosswalks and Sidewalk Plan, dated June 9, 2022
  33. Jones Copy of 2005 DPH Memo, received June 9, 2022
  34. J. and K. Shroff Support Email to E. Wentworth, dated June 9, 2022
  35. G. and M. O'Meara Support Email to E. Wentworth, dated June 9, 2022
  36. E. and J. Cignetti Support Email to E. Wentworth, dated June 9, 2022
  37. J. Jackson Response to Traffic Review Comments, dated June 8, 2022
  38. Sheet C5.4 Plan, revised through June 9, 2022
  39.  Traffic Plan, received June 9, 2022
  40. General Plan, received June 9, 2022
  41. J. Dirk Supplemental Traffic Peer Review, dated June 13, 2022
  42. E. Sullivan email to M. Silveira Regarding Conservation Review, dated June 14, 2022
  43. Continuance & Extension, dated June 17, 2022
  44. J. Jackson Response to Traffic Review Comments to M. Silveira, dated June 22, 2022
  45. Updated General Plan, received June 22, 2022
  46. J. Dirk Supplemental Traffic Review Letter to M. Silveira, dated June 30, 2022
  47. Acoustic Review & Feedback Report, dated July 6, 2022
  48. Traffic and Parking Management Plan, revised July 6, 2022
  49. Landscape Plan, revised July 6, 2022
  50. S. Jones email to Planning Board, dated July 11, 2022
  51. E. Sullivan Response to Public Comment, dated July 11, 2022
  52. Continuation Request, dated July 19, 2022
  53. DaSilva Certification, dated July 26, 2022.
  54. Letter from K. DiFazio to Planning Board, dated July 25, 2022
  55. Email from C. Galgay to Planning Board, dated July 29, 2022
  56. C. Rotti email to K. Whalen, dated July 29, 2022
  57. Land Court Appeal, dated September 8, 2022

213 & 215 Cushing Street
Flexible Residential Development

Jeffrey Tocchio, Esq. on behalf of Bristol Bros. Development Corp. filed an application in connection with its proposed Flexible Residential Development pursuant to Section IV-D of the Zoning By-Law, for the property located at 213 and 215 Cushing Street in the Residence C District.

  1. Flexible Residential Development Summary from 2001 Town Meeting
  2. Letter from J. Tocchio to C. Falvey and K. Ellis, dated August 19, 2021
  3. Application for Zoning Hearing, Form 2, dated August 19, 2021
  4. Application for Special Permit A-3, dated August 19, 2021
  5. Application for Site Plan Approval in Association with Application for Building Permit, dated August 19, 2021
  6. Supplement to Applications, dated August 19, 2021
  7. Plans, dated August 19, 2021
  8. Memo from E. Sullivan to Planning Board, dated September 8, 2021
  9. Letter from S. Sarni to Planning Board, dated September 15, 2021
  10. Letter from C. DiNapoli to Planning Board, dated September 16, 2021
  11. Letter from A. and R. Gomez to Planning Board, dated September 21, 2021
  12. Letter from P. Brennan to Planning Board, dated September 21, 2021
  13. G. Crocker letter to Planning Board in Response to Peer Review, dated September 23, 2021
  14. Updated Conceptual Subdivision Plan, dated September 23, 2021
  15. Letter from L. Schneiderhan to Planning Board, dated September 27, 2021
  16. Continuation and Extension Request, dated September 29, 2021
  17. Letter from J. Dirk to E. Wentworth Regarding Traffic Analysis, dated November 1, 2021
  18. Continuation and Extension Request, dated November 4, 2021
  19. Fully Executed and Filed Continuation and Extension Request, dated November 10, 2021
  20. Continuation and Extension Request, dated December 10, 2021
  21. Fully Executed Continuation and Extension Request, dated December 15, 2021
  22. Continuation and Extension Request, dated December 21, 2021
  23. Town Clerk Stamped Fully Executed Continuance and Extension Request, dated January 10, 2022
  24. J. Tocchio Letter to C. Falvey and K. Ellis Regarding Revised Materials, dated January 12, 2022
  25. Preliminary Plans, Revised through January 7, 2022
  26. G. Crocker Letter to Planning Board Regarding Response to Amory Engineers Peer Review, dated January 12, 2022
  27. G. Crocker Letter to Planning Board Regarding Response to Vanasse & Associates Peer Review, dated January 12, 2022
  28. J. Dirk Letter to E. Wentworth Regarding Response to Traffic Peer Review, dated January 14, 2022
  29. G. Crocker Letter to Planning Board Regarding Response to Vanasse & Associates Peer Review, dated January 19, 2022
  30. Preliminary FRD Sight Distance Exhibit, dated January 18, 2022
  31. P. Brennan Letter to Planning Board, dated January 20, 2022
  32. J. Dirk Letter to E. Wentworth Regarding Response to Traffic Peer Review, dated January 21, 2022
  33. Continuation and Extension Request, dated January 26, 2022
  34. Revised Plan Set, dated February 24, 2022

208 Downer Avenue
Application for Site Plan Review in Association with a Special Permit A2

Hingham Yacht Club filed an application for Site Plan Review under §§ I-G and I-I and a Special Permit A2 and/or Waivers under §§ I-I 4 and such other relief as necessary to allow the removal of an existing barn and construction of a new two-story boat barn located at 208 Downer Avenue, in the Residence B District. 

  1. Letter from J. Cavanaro to K. Ellis and E. Wentworth, dated August 12, 2021
  2. Application for Site Plan Review and /or Waivers in Association with Application for Special Permit A2, dated August 12, 2021
  3. Plans, dated August 12, 2021
  4. Stormwater Report, dated August 12, 2021
  5. Site Plan, dated August 11, 2021
  6. Letter of Support from M. Kranzley to Planning Board, dated August 28, 2021
  7. Memo from Neighbors to Planning Board, dated September 3, 2021
  8. Updated Letter from M. Kranzley to Planning Board, dated September 8, 2021
  9. B. Holmgren Letter to K. Ellis and Planning Board, dated September 12, 2021
  10. Continuation and Extension Request, dated September 20, 2021
  11. M. Kranzley Letter to Planning Board, dated September 28, 2021
  12. Letter from J. Cavanaro to K. Ellis and E. Wentworth, dated October 5, 2021
  13. Revised Site Plan, dated October 4, 2021
  14. Revised Existing Condition Plan, dated October 4, 2021
  15. Landscape Plan, dated October 5, 2021
  16. Letter from P. Brennan to Planning Board and Zoning Board of Appeals, dated October 6, 2021
  17. Letter from J. Cavanaro to K. Ellis and E. Wentworth Regarding Response to Review Comments, dated October 8, 2021
  18. Site Plan, Revised October 8, 2021
  19. Letter from P. Brennan to E. Wentworth Regarding Peer Review, dated October 8, 2021
  20. Letter from M. Kranzley to Planning Board and Zoning Board of Appeals, dated October 14, 2021
  21. Continuation and Extension Request, dated October 19, 2021