Applications Pending

1237 Main Street (aka 1 Whiting Street)

Site Plan Review in Association with a Building Permit - Waiver Request

MoveRemove

Robert Fedus, on behalf of Harrier Development, LLC filed an application to waive site plan review under § I-I, 5. of the Zoning By-Law for interior modifications at the property located in the Business B District.

  1. Application for Site Plan Approval Waiver Request, dated October 22, 2021
  2. Plan Set, dated October 22, 2021

37 Derby Street, Suite 3 

Site Plan Review in Association with a Building Permit - Waiver Request

MoveRemove

Robert Shepard, on behalf of 37 Derby Street, LLC filed an application to waive site plan review under § I-I, 5. of the Zoning By-Law for interior modifications at the property located in the Business B District.

  1. Application for Site Plan Approval Waiver Request, dated October 21, 2021

92 Derby Street, Suite 119 (Blue Mercury)

Site Plan Review in Association with a Building Permit - Waiver Request

MoveRemove

Saran Hunter, on behalf of LGA Partners filed an application to waive site plan review under § I-I, 5. of the Zoning By-Law for interior modifications at the property located in the Industrial Park and South Hingham Overlay Districts.

  1. Application for Site Plan Approval Waiver Request, dated October 19, 2021
  2. Plan Set, dated October September 17, 2021

94 Derby Street, Suite 243 (All Birds)

Site Plan Review in Association with a Building Permit - Waiver Request

MoveRemove

Sherri Schuler, on behalf of W/S/M Hingham Properties, LLC filed an application to waive site plan review under § I-I, 5. of the Zoning By-Law for interior modifications at the property located in the Industrial Park and South Hingham Overlay Districts.

  1. Application for Site Plan Approval Waiver Request, dated October 19, 2021
  2. Site Plan, dated October 18, 2021

0 R Rockwood Road and 36 East Street

Site Plan Review in Association with a Building Permit - Land Disturbance

MoveRemove

Jeffrey Hassett, on behalf of Christine and Gregory Fletcher filed an application for Site Plan Approval under §§ I-I and IV-B.6 and waivers under § I-I of the Zoning By-Law and such other relief as necessary to construct a single-family dwelling and other improvements at the property located in the Residence A District.

  1. Application for Site Plan Approval, dated October 12, 2021
  2. Letter from J. Hassett to Planning Board with Enclosures, dated October 12, 2021
  3. Site and Septic Design Plan Sheet 1, dated October 12, 2021
  4. Site and Septic Design Plan Sheet 2, dated October 12, 2021

21 Whiton Avenue

Site Plan Review in Association with a Building Permit

MoveRemove

Brendan Sullivan on behalf of Falconeiri Construction, Inc. submitted an application for Site Plan Approval in Association with a Building Permit under §§ I-I and IV-B.6. with waiver requests under § I-I of the Zoning By-Law and such other relief necessary to raze and rebuild a single-family dwelling and make other improvements at the property located in the Residence District A.

  1. Letter from B. Sullivan to E. Wentworth, dated October 7, 2021
  2. Application for Site Plan Approval, dated October 7, 2021
  3. Site Plan, dated October 7, 2021
  4. Stormwater Report, dated October 7, 2021
  5. Letter from P. Brennan to Planning Board, dated October 20, 2021
  6. Letter from B. Sullivan to K. Ellis, Response to Review Comments, dated October 21, 2021
  7. Revised Site Plan, dated October 21, 2021
  8. Letter from P. Brennan to Planning Board, dated October 22, 2021

Downer Estates Subdivision off Planters Field Lane

Request for Lot Releases and Deferral of Submission of As-Built Plan

MoveRemove

Stephen McLaughlin, Esq. on behalf of Feeley Development Trust, pursuant to MGL c. 41 § 81U and the Planning Board Rules and Regulations Adopted under the Subdivision Control Law as Amended Through September 11, 2018, submitted an application requesting lot releases for Lots 1, 2 and 3 from the previously approved Form E Covenant and deferral of submission of an as-built plan for the Downer Estates Subdivision located in Residence A District.

  1. Letter from S. McLaughlin, Esq. to Planning Board, dated October 4, 2021
  2. Letter from S. McLaughlin, Esq. to Planning Board, dated October 4, 2021
  3. Letter from S. McLaughlin, Esq. to C. Falvey and Planning Board with Enclosures, dated October 4, 2021
  4. Interim As-Built Plan, dated October 20, 2021
  5. Landscaping Estimate

3 Home Meadows Lane

Site Plan Review in Association with a Building Permit

MoveRemove

Jeffery Tocchio, Esq. on behalf of Kevin and Kathryn Caulfield, submitted an application for Site Plan Approval in Association with a Building Permit under §§ I-I and IV-B.6. with waiver requests under § I-I of the Zoning By-Law and such other relief necessary to alter and move an existing single-family dwelling and undertake related site alterations at the property located in the Residence District A.

  1. Letter from J. Tocchio, Esq. to C. Falvey, dated September 28, 2021
  2. Application for Site Plan Approval in Association with a Building Permit, dated September 28, 2021
  3. Plan Cover Sheet, dated September 28, 2021
  4. Proposed Site Plans, dated September 28, 2021
  5. Letter from P. Brennan to Planning Board, dated October 22, 2021

0 Home Meadows Lane

Site Plan Review in Association with a Building Permit

MoveRemove

Jeffery Tocchio, Esq. on behalf of Kevin and Kathryn Caulfield, submitted an application for Site Plan Approval in Association with a Building Permit under §§ I-I and IV-B.6. with waiver requests under § I-I of the Zoning By-Law and such other relief necessary to alter and move an existing single-family dwelling and undertake related site alterations at the property located in the Residence District A.

  1. Letter from J. Tocchio, Esq. to C. Falvey, dated September 28, 2021
  2. Application for Site Plan Approval in Association with a Building Permit, dated September 28, 2021
  3. Plan Cover Sheet, dated September 28, 2021
  4. Proposed Site Plans, dated September 28, 2021
  5. Letter from P. Brennan to Planning Board, dated October 22, 2021

10 Howe Street

Site Plan Review in Association with a Building Permit

MoveRemove

Jeffrey Hassett, P.E. on behalf of 10 Howe Street LLC submitted an application for Site Plan Approval in Association with a Building Permit and or Waivers under § I-I.6 and other such requirements under § I-I of the Zoning By-Law, as the applicants seek to raze and reconstruct a single family home at 10 Howe Street in the Residence A District.

  1. Application for Site Plan Approval in Association with a Building Permit, dated September 22, 2021
  2. Letter from J. Hassett to Planning Board, dated September 22, 2021
  3. Letter from J. Hassett to Planning Board Regarding Drainage Analysis, dated September 22, 2021
  4. Site Plan, dated September 22, 2021
  5. Letter from P. Brennan to Planning Board, dated October 14, 2021
  6. Revised Site Plan, dated October 20, 2021
  7. Letter from P. Brennan to Planning Board, dated October 20, 2021

193 Whiting Street

Application for Site Plan Approval in Association with Application for Special Permits A2 and A3 

Jeffery Tocchio, Esq. on behalf of 193 Whiting, LLC filed an application for a Special Permit A2 under § III-A, § 4.11A of the Zoning By-Law, with Site Plan Review under §§ I-G and I-I and a Special Permit A3 Parking Determination under § V-A and such other relief as necessary to re-construct and operate a freestanding drive-up ATM with related parking and improvements in Business District B.

  1. Cover Letter from J. Tocchio to C. Falvey, dated September 21, 2021
  2. Application for Zoning Hearing Form 2, dated September 21, 2021
  3. Form 2D, Special Permit A2 Site Plan Review, dated September 21, 2021
  4. Form 2B Variance, dated September 21, 2021
  5. Application for Special Permit A-3, September 21, 2021
  6. Application for Site Plan Approval in Association with Application for Special Permit A2, dated September 21, 2021
  7. Site Plans, dated September 21, 2021 
  8. Stormwater Management Report, dated September 21, 2021 
  9. Traffic Assessment, dated September 30, 2021
  10. P. Brennan Letter to Planning Board, dated October 19, 2021

84 North Street

Application for Site Plan Approval in Association with Application for Special Permits A2 and A3 

Nicole Storey filed an application for a Special Permit A2 under § III-A, 4.9B of the Zoning By-Law, with Site Plan Review under §§ I-G and I-I and a Special Permit A3 Parking Determination under § V-A, and such other relief as necessary to allow for the location of a Bakery/Café in a 1,000 SF tenant space within an existing building at 84 North Street in Business District A and the Downtown Hingham Overlay District.

  1. Application for a Hearing, Form 2, dated September 20, 2021
  2. Application for a Special Permit A2, Form 2D, dated September 20, 2021
  3. Application for a Waiver of Site Plan Review, dated September 20, 2021
  4. Application for a Special Permit A3, dated September 20, 2021
  5. Proposed Floor Plan, dated September 20, 2021
  6. Request for Withdrawal, dated October 12, 2021

94 Derby Street, Suite 217

Application for Site Plan Approval in Association with Application for Special Permit A2

MoveRemove

Victoria Maguire on behalf of W/S/M Hingham Properties LLC filed an application for Site Plan Approval under §§ I-G and I-I and a Special Permit A2 and/or Waivers under §§ I-I 4 and such other relief as necessary to allow the enclosure of a patio with retractable windows at 94 Derby Street, Suite 217, in the Industrial Park and South Hingham Development Overlay Districts. 

  1. Site Plan Approval Application in Association with Application for Special Permit A2, dated September 7, 2021
  2. Form 2D, Special Permit A2 Site Plan Review, dated September 7, 2021
  3. Application for a Zoning Hearing, dated September 7, 2021

213 & 215 Cushing Street

Flexible Residential Development

MoveRemove

Jeffrey Tocchio, Esq. on behalf of Bristol Bros. Development Corp. filed an application in connection with its proposed Flexible Residential Development pursuant to Section IV-D of the Zoning By-Law, for the property located at 213 and 215 Cushing Street in the Residence C District.

  1. Flexible Residential Development Summary from 2001 Town Meeting
  2. Letter from J. Tocchio to C. Falvey and K. Ellis, dated August 19, 2021
  3. Application for Zoning Hearing, Form 2, dated August 19, 2021
  4. Application for Special Permit A-3, dated August 19, 2021
  5. Application for Site Plan Approval in Association with Application for Building Permit, dated August 19, 2021
  6. Supplement to Applications, dated August 19, 2021
  7. Plans, dated August 19, 2021
  8. Memo from E. Sullivan to Planning Board, dated September 8, 2021
  9. Letter from S. Sarni to Planning Board, dated September 15, 2021
  10. Letter from C. DiNapoli to Planning Board, dated September 16, 2021
  11. Letter from A. and R. Gomez to Planning Board, dated September 21, 2021
  12. Letter from P. Brennan to Planning Board, dated September 21, 2021
  13. G. Crocker letter to Planning Board in Response to Peer Review, dated September 23, 2021
  14. Updated Conceptual Subdivision Plan, dated September 23, 2021
  15. Letter from L. Schneiderhan to Planning Board, dated September 27, 2021
  16. Continuation and Extension Request, dated September 29, 2021

208 Downer Avenue

Application for Site Plan Review in Association with a Special Permit A2

MoveRemove

Hingham Yacht Club filed an application for Site Plan Review under §§ I-G and I-I and a Special Permit A2 and/or Waivers under §§ I-I 4 and such other relief as necessary to allow the removal of an existing barn and construction of a new two-story boat barn located at 208 Downer Avenue, in the Residence B District. 

  1. Letter from J. Cavanaro to K. Ellis and E. Wentworth, dated August 12, 2021
  2. Application for Site Plan Review and /or Waivers in Association with Application for Special Permit A2, dated August 12, 2021
  3. Plans, dated August 12, 2021
  4. Stormwater Report, dated August 12, 2021
  5. Site Plan, dated August 11, 2021
  6. Letter of Support from M. Kranzley to Planning Board, dated August 28, 2021
  7. Memo from Neighbors to Planning Board, dated September 3, 2021
  8. Updated Letter from M. Kranzley to Planning Board, dated September 8, 2021
  9. B. Holmgren Letter to K. Ellis and Planning Board, dated September 12, 2021
  10. Continuation and Extension Request, dated September 20, 2021
  11. M. Kranzley Letter to Planning Board, dated September 28, 2021
  12. Letter from J. Cavanaro to K. Ellis and E. Wentworth, dated October 5, 2021
  13. Revised Site Plan, dated October 4, 2021
  14. Revised Existing Condition Plan, dated October 4, 2021
  15. Landscape Plan, dated October 5, 2021
  16. Letter from P. Brennan to Planning Board and Zoning Board of Appeals, dated October 6, 2021
  17. Letter from J. Cavanaro to K. Ellis and E. Wentworth Regarding Response to Review Comments, dated October 8, 2021
  18. Site Plan, Revised October 8, 2021
  19. Letter from P. Brennan to E. Wentworth Regarding Peer Review, dated October 8, 2021
  20. Letter from M. Kranzley to Planning Board and Zoning Board of Appeals, dated October 14, 2021
  21. Continuation and Extension Request, dated October 19, 2021

249 Cushing Street

Application for Rescission of Definitive Subdivision Plan

MoveRemove

Rachel and John Swenson filed an application to rescind the definitive subdivision plan endorsed by the Planning Board on September 12, 2016 for the property located at 249 Cushing Street in the Residence C District. 

  1. Form C-1, Application for Rescission of Definitive Subdivision Plan, dated August 16, 2021
  2. Definitive Subdivision Plan - Page 1, dated September 12, 2016
  3. Definitive Subdivision Plan - Page 2, dated September 12, 2016
  4. Definitive Subdivision Plan - Page 3, dated September 12, 2016
  5. Definitive Subdivision Plan - Page 4, dated September 12, 2016
  6. Definitive Subdivision Plan - Page 5, dated September 12, 2016

0 & 3 Home Meadows Lane

ANR Application

MoveRemove

The Alice H. Brewer 2000 Revocable Trust c/o Jeffery A. Tocchio, Esq. requested re-endorsement of an ANR plan under the Subdivision Control Law for 0 & 3 Home Meadows Lane, located in the Residence A District. 

  1. Letter from J. Tocchio to E. McCracken, dated June 7, 2021
  2. ANR Land Court Worksheet, page 1, dated December 12, 2020
  3. ANR Land Court Worksheet, page 2, dated December 12, 2020
  4. ANR Plan of Land, dated February 1, 2021
  5. Letter from S. Brenner to K. Ellis Requesting Re-Endorsement of Plans, dated September 17, 2021
  6. Previously Endorsed Plans, Endorsed June 23, 2021
  7. Mylar Land Court Worksheet, page 1, dated July 25, 2021
  8. Mylar Land Court Worksheet, page 2, dated July 25, 2021
  9. Mylar Plan of Land, dated July 25, 2021

0 Popes Lane

Site Plan Review in Association with a Building Permit

MoveRemove

Joseph and Kathryn Crespo submitted an application for Site Plan Review under § I-I.6 and other such requirements under § I-I of the Zoning By-Law, as the applicants seek to raise and reconstruct a single family home on a 24.3 acre property at 0 Popes Lane in Residence District C.

  1. Lot & Septic Design Plan, dated May 26, 2021, page 1
  2. Lot & Septic Design Plan, dated May 26, 2021, page 2
  3. Drainage Analysis Prepared by Morse Engineering Company, Inc., dated May 26, 2021
  4. Site Plan Review Application, dated June 1, 2021
  5. Letter from P. Brennan to Planning Board, dated June 17, 2021
  6. Lot & Septic Design Plan, dated June 17, 2021
  7. Amory Engineers HydroCAD Report, dated June 21, 2021
  8. Letter from C. DiNapoli to Planning Board, dated June 16, 2021
  9. Continuation and Extension Request, dated July 9, 2021
  10. Continuation and Extension Request, dated July 27, 2021
  11. Letter from J. Hassett to Planning Board, dated August 19, 2021
  12. Lot and Septic Design Plan, dated May 26, 2021, revised through August 19, 2021

Crane Drive (formerly Red Tail Lane)

Crane Drive is a single lot subdivision approx. 300 in length off of Gardner Street that was before the Planning Board in 2019. The   applicant has completed the subdivision and is now requesting As-Built Approval and release of surety posted for the proposed work. 

220 Summer Street

Site Plan Review in Association with a Building Permit - Modification Request

MoveRemove

Ryan Sillery applied for a request to modify a previous Site Plan Approval under Sections I-I and IV-B, 6.of the Zoning By-Law, dated October 27, 2020, for modification of a single-family residence and lot grading at 220 Summer Street in Residence District C.

     Current Application Materials

  1. Application for request for modification of Site Plan Approval, dated April 27, 2021
  2. Site Pan, dated April 27, 2021
  3. Grading Plan, dated March 18, 2021
  4. Engineering Peer Review from J. Chessia, dated May 20, 2021
  5. Engineering Peer Review Photos
  6. Site Photo, dated July 8, 2021
  7. Letter from G. James to C. Stickney, dated July 15, 2021
  8. Erosion Control Plan, dated July 15, 2021
  9. Soil Assessment for On-Site Sewage Disposal, dated July 15, 2021
  10. Operation and Maintenance Plan, dated July 15, 2021
  11. Drainage Calculations revised July 8, 2021, received July 15, 2021
  12. Existing Watershed Plan, dated May 29, 2021, received July 15, 2021
  13. Watershed Plan, dated May 29, 2021, received July 15, 2021
  14. Site Plan, revised July 8, 2021, received July 15, 2021
  15. Continuation and Extension Request, dated July 16, 2021
  16. Site Plans, dated March 15, 2021, Revised August 2, 2021
  17. Existing Watershed Plan, dated May 29, 2021, Revised August 2, 2021
  18. Memo from C. Stickney to Planning Board, dated August 9, 2021
  19. Letter from J. Chessia to Planning Board, dated August 9, 2021
  20. Continuation and Extension Request, dated August 10, 2021
  21. Drainage Calculations, revised through August 23, 2021
  22. Erosion Control Plan, revised through August 23, 2021
  23. Operation and Maintenance Plan, revised through August 23, 2021
  24. Site Plan - Sheet 1, revised through August 23, 2021
  25. Site Plan - Sheet 2, revised through August 23, 2021
  26. Site Plan - Sheet 3, revised through August 23, 2021
  27. Site Plan - Sheet 4, revised through August 23, 2021
  28. Site Plan - Sheet 5, revised through August 23, 2021
  29. Site Plan - Sheet 6, revised through August 23, 2021
  30. Site Plan - Sheet 7, revised through August 23, 2021
  31. Site Plan - Sheet 8, revised through August 23, 2021
  32. James Engineering Letter to C. Stickney and Planning Board, dated August 26, 2021
  33. Landscape Plan, dated September 8, 2021
  34. J. Chessia Supplemental Engineering Review Letter to the Planning Board, dated September 9, 2021 

     Previous Decisions & Materials

  1. Environmental Assessment Report of 156 East Street, dated October 13, 2017
  2. Site Plan Review Decision, dated April 9, 2019
  3. Wetland Site Investigation, dated September 3, 2019
  4. Conservation Commission Meeting Minutes, dated October 7, 2019
  5. Approved Site Plan, dated September 27, 2020
  6. Planning Board Minutes, dated October 26, 2020
  7. Site Plan Review Decision, dated October 28, 2020

274 South Street

Site Plan Review in Association with a Building Permit

MoveRemove

South Shore Country Club filed an application for Site Plan Review in Association with a Building Permit to construct a new maintenance facility on the currently developed property at 274 South Street in the Business Recreation District.

  1. Application for Site Plan Review in Association with a Building Permit, dated April 12, 2021
  2. Stormwater Management Report
  3. Site Plans
  4. Peer Review from P. Brennan to Conservation Commission, dated April 15, 2021
  5. Notice of Intent from H. Charles Lis to Conservation Commission, dated May 17, 2021
  6. Response to Planning Board Comments from J. Jackson, dated May 19, 2021

40 Harbor View Drive

Site Plan Review in Association with a Building Permit

MoveRemove

Adam Fleury filed an application for Site Plan Review in Association with a Building Permit as the overall disturbance of slopes is greater than 10%, per Section IV-B.6.b of the Zoning By-Law, at 40 Harbor View Drive in Residence District A.

  1. Application for Site Plan Review in Association with a Building Permit, received April 12, 2021
  2. Plan Summary & Stormwater Report from Cavanaro Consulting
  3. Site Plan
  4. Engineering Peer Review from J. Chessia, dated April 29, 2021
  5. Response to Review Comments from B. Sullivan, dated May 18, 2021
  6. Site Plan, revised May 18, 2021
  7. Stormwater Report, revised May 18, 2021
  8. Supplemental Engineering Review from J. Chessia, dated May 28, 2021
  9. Staff Report with Pictures, dated June 14, 2021
  10. Letter from M. Clancy to Planning Board, dated June 14, 2021
  11. Continuation and Extension Request, dated June 15, 2021
  12. Letter from B. Sullivan to K. Ellis Re Response to Review Comments, dated June 22, 2021
  13. Cavanaro Consulting Site Plan Review App & Stormwater Report, dated June 22, 2021
  14. Supplemental Engineering Review from J. Chessia, dated June 29, 2021
  15. Letter from M. Clancy to Planning Board, dated June 30, 2021
  16. Landscaping Plan, dated June 30, 2021
  17. Plantings List, dated June 30, 2021
  18. Response to Review Comments from B. Sullivan, dated July 2, 2021
  19. Landscape Plan, dated June 24, 2021
  20. Abutters Approval of Landscape Design
  21. Revised Site Plan, Page 1, dated July 6, 2021
  22. Revised Site Plan, Page 2, dated July 6, 2021
  23. J. Chessia Summary of Issues, dated July 7, 2021

4 Jordan Way

Site Plan Review in Association with a Building Permit

MoveRemove

James Engineering, Inc. filed an application for Site Plan Review in Association with a Building Permit as the overall disturbance on the lot is in excess of 20,000 SF and the existing grade exceeds 10% over 30,000± SF of the proposed site disturbance area which is in excess of the 2,500 SF limit, per Section IV-B.6.b of the Zoning By-Law, at 4 Jordan Way in Residence District C.

  1. Application Letter from G. James to C. Stickney, dated March 29, 2021
  2. Set of Plans
  3. Engineering Review from J. Chessia to Planning Board, dated April 20, 2021
  4. Supplemental Engineering Review from J. Chessia to Planning Board, dated May 6, 2021
  5. Response to Peer Review from G. James to Planning Board, dated June 5, 2021
  6. Plan of Land, revised June 7, 2021
  7. Letter from A. Toomey to Planning Department, dated June 10, 2021
  8. Site Layout, dated March 7, 2021
  9. Landscape Plan, dated April 27, 2021
  10. Tree Planting Area Photo
  11. Supplemental Engineering Review from J. Chessia to Planning Board, dated June 17, 2021
  12. Site Photos, dated June 17, 2021
  13. Response to Review Letter from G. James to C. Stickney, dated July 13, 2021 
  14. Revised Plans, dated June 30, 2021
  15. Draft Letter from J. Chessia to Planning Board, dated July 15, 2021
  16. Continuance and Extension Request, dated July 23, 2021
  17. Memo from J. Chessia to Planning Board, dated July 26, 2021
  18. Site Grading Plan, dated March 7, 2021, Revised through June 30, 2021, Received July 29, 2021
  19. Updated Draft of Site Grading Plan, dated March 7, 2021, Revised through June 30, 2021, Received July 29, 2021
  20. Letter from G. James to C. Stickney, dated August 3, 3021
  21. Plan of Land, dated March 7, 2021, revised through July 30, 2021
  22. Landscape Plan, dated April 27, 2021, revised through July 29, 2021
  23. Letter from G. James to C. Stickney, dated August 5, 2021
  24. Landscape Plan, dated April 27, 2021, revised August 4, 2021
  25. Plan of Land, dated March 7, 2021, revised August 3, 2021
  26. Landscape Plan, dated April 27, revised August 4, 2021, received August 6, 2021
  27. Plan of Land, dated March 7, 2021, received August 6, 2021
  28. Continuance and Extension Request, dated August 9, 2021

101 Gardner Street

Application for Definitive Subdivision Approval

MoveRemove

New Boston Golf Club filed an application for Definitive Subdivision Approval of a residential subdivision road, consisting of approximately 312 linear feet, to serve as access for three (3) residential lots and one (1) drainage lot on 4.95 ac (+/-) of land located on a portion of the property at 101 Gardner Street (Assessors’ Map 178, Lot 5) in Residence District B.

  1. Application Package for Definitive Subdivision Approval, dated March 2, 2021
  2. Definitive Subdivision Plan Set
  3. Fire Marshal Letter from C. DiNapoli to Planning Board, dated March 4, 2021
  4. Stormwater Report from Grady Consulting LLC, dated February 25, 2021
  5. Engineering Peer Review Report from P. Brennan to Planning Board, dated April 13, 2021
  6. Definitive Subdivision Plan Set, revised April 22, 2021
  7. Stormwater Report from Grady Consulting LLC, revised April 22, 2021
  8. Letter from P. Seaberg to Planning Board with Response to Comments, dated April 22, 2021
  9. Engineering Peer Review from P. Brennan to Planning Board, dated April 27, 2021
  10. Definitive Subdivision Plan Set, revised April 29, 2021
  11. Traffic Engineering Peer Review from J. Dirk to Planning Board, dated April 30, 2021
  12. Letter from P. Seaberg to Planning Board with Response to Comments, dated April 30, 2021
  13. Letter from R. Tierney to C. Walker regarding Water Service Inquiry, dated April 30, 2021
  14. Traffic Engineering Peer Review from J. Dirk, dated May 3, 2021
  15. Engineering Peer Review from P. Brennan, dated May 3, 2021
  16. Stormwater Report from Grady Consulting LLC, dated June 28, 2021
  17. Letter from P. Seaberg to Planning Board, dated June 29, 2021
  18. Revised Definitive Subdivision Plan, dated June 29, 2021
  19. Stormwater Report from Grady Consulting LLC, dated June 30, 2021
  20. Engineering Peer Review from P. Brennan, dated July 1, 2021

100 Industrial Park Road

Site Plan Review, Special Permit A3 

  1. Special Permit A3 Decision, dated April 29, 2021
  2. Site Plan Review Decision, dated April 29, 2021
  3. Traffic Study 2020
  4. Project Narrative_2020-03-06
  5. Stormwater Report
  6. Planning-Application Submission Transmittal Letter 2020-03-09
  7. Application for Site plan approval in association with apllication for building permit_2020-03-06
  8. Civil Plan Set (2020-03-06) - Stamped
  9. Special Permit A-3 executed
  10. Board of Health comments
  11. Photo 1
  12. Photo 2
  13. Photo 3
  14. Photo 4
  15. Suspension of Hearing
  16. Suspension of 100 Industrial
  17. Civil Peer Review comments 1
  18. 100 Industrial Pk Rd Traffic Review 05.11.20
  19. Response to comments on WWTP
  20. Civil Plan Set-2020-06-04
  21. Revised Traffic Study-2020-06
  22. Responses to Traffic Peer Review-2020-06-04
  23. Suspension of 100 Industrial to July 13th
  24. Suspension of 100 Industrial to July 27th
  25. June 25 email
  26. Conservation email about erosion controls
  27. 100 Industrial Pk Rd Supplemental Traffic Review 06.24.20
  28. Hingham Electric Water Easement 1963
  29. Revised AUL HIngham 4-28-2012
  30. Hingham Water Easement 1965
  31. Hingham Electric Easement 50ft 1964
  32. Hingahm Registered Land Plans Easements
  33. June 29 transmittal email for easements
  34. Merriman WWTF transfer letter to JEB 1999
  35. t5form11 100 Industrial Park Road D1
  36. t5form11 100 Industrial Park Road D2
  37. GW Discharge Permit 0-98
  38. JEB Hingham BoH 2019 2020
  39. JEB DEP GW permit invoices 2019 2020
  40. Merriman Letter to DEP 1997 Re GW Disch Permit
  41. t5form12100 Industrial Park Road B
  42. t5form12100 Industrial Park Road A
  43. t5form11 100 Industrial Park Road C
  44. t5form11 100 Industrial Park Road B
  45. t5form11 100 Industrial Park Road A
  46. Correspondence on tree removal
  47. Tree Removal map - post clearing
  48. 1901517-CivilSet-2020-07-13
  49. 100 Industrial Park-1989-site-plan
  50. C-RTC-SavageDunham.M-1901517-EngrPeerReview-RTC_2020-07-13
  51. C-RPT-1901517-SWPPP-2020-07-13
  52. C-RPT-1901517-SWMR-2020-07-13
  53. T-RTC-SavageDunham.M-1901517-TrafficPeerReview2-RTC_2020-07-13
  54. T-RPT-1901517-TrafficStudy-2020-07
  55. Feldman Plot Plan
  56. SDP190151701-SDP-1 24x36 40SC
  57. Water usage data
  58. Septic disposal plan
  59. Alternate Plans (2020-07-27)
  60. Transmittal to PLANNING_BOARD_2020-08-13
  61. Transmittal to John Chessia 2020-08-13
  62. Civil Plan Set-2020-08-11-Final
  63. -Conservation comments Response3_2020-08-24
  64. Civil_Set_(2020-08-24)
  65. O and M
  66. Comments from AW Perry to Planning Board re: proposed development, 08.27.2020
  67. Letter stating no intent to seek off site parking
  68. Applicant response to AW Perry letter
  69. Response to comments 09.04.20 VAI Comments
  70. 100 Industrial Pk Rd Supplemental Traffic Review 09.09.20
  71. Peer Review letter 2 - John Chessia
  72. SSEC comments
  73. Fire Prevention Comments - Amazon 100 Industrial 9-11-20
  74. Perry Amazon Comments
  75. Plot Plan January 25 2008
  76. 20200930 LSP Opinion Infiltration Feasibility Hingham
  77. C-RTC-SavageDunham.M-1901517-SuppTrafficReview-RTC_2020-09-30
  78. C-RTC-SavageDunham.M-1901517-SuppEngrReview-RTC_2020-09-30
  79. C-RTC-SavageDunham.M-1901517-FireMarshal_2020-09-30
  80. 100 Industrial Pk Rd Supplemental Traffic Review 10.15.20
  81. Amazon Operations Profile compiled by J. Dirk from submittal
  82. Civil Peer Review 3 100 Industrial Park Rd
  83. Response to Hingham Planning Board Comments -- FINAL DRAFT markup 10.26.20 (002)
  84. C-MEMO-1901517-Water Budget-2020-10-16
  85. Response to comments- Engr. Review 3-2020-10-26-
  86. Response to comments-Supp. Traffic Peer Review 3_2020-10-26
  87. Response-BoltDepot-1901517-PublicComments_2020-10-26
  88. Response-DugmoreDuncan-1901517-PublicComments_2020-10-26
  89. Response-SouthShoreHealth-1901517-PublicComments_2020-10-26
  90. Response-SSEC-1901517-PublicComments_2020-10-26
  91. Response-VenusWafers-1901517-PublicComments_2020-10-26
  92. Public Comments -Amazon South Shore Park-10.23.2020
  93. Public Comments - amazon-research-rd
  94. Public Comments Hingham Planning Board
  95. Public Comments amazon signed
  96. DBC6- Operational Summaryv2
  97. T-MEM-Hingham-TrafficOpsCompMemorandum-2020-10-20
  98. Email transmittal of 4th revision electronic files
  99. O and M Manual
  100. Amazon Planning Board Letter
  101. HMLP Easement 100 Industrial Park Rd Underground Easement 10.13.20 Draft
  102. -Conservation Response 4 _2020-10-26
  103. Response to the -PLANNING_BOARD_2020-11-04
  104. -Civil-Plan Set-(2020-11-04)
  105. Response to John Chessia_2020-11-04
  106. Response to the -CONSERVATION_COMMISSION_2020-11-04
  107. Stormwater 2020-11-04
  108. Letter to Applicant from Jeffrey Dirk re MEPA 11.03.20
  109. Email transmittal of 4th revision electronic files
  110. Memorandum-Planning Board-100 Industrial Park Application-Questions for the Appplicant-GTD-11-7-2020
  111. C-RTC-SavageDunham.M-Winsupply-1901517-PublicComments_2020-11-13
  112. C-RTC-SavageDunham.M-BergstenMusic-1901517-PublicComments_2020-11-13
  113. jeb letter0001
  114. 100 Industrial Pk Rd Outstnading Items 11.13.20
  115. C-LTR-Kim.T-MEPA-1901517-AdvisoryOpinionLtrRequest_2020-11-13
  116. Nov 13 MA DOT email to applicant
  117. Nov 11 letter Coast IPC
  118. Nov 12 letter Dugmore and Duncan
  119. A.W. Perry Comment Letter 11.16.20
  120. Nov 11 letter Coast IPC
  121. C-LTR-Kim.T-MEPA-1901517-AdvisoryOpinionLtrRequest_2020-11-13
  122. A.W. Perry Response Letter 2 11.16.20
  123. C-RTC-Berthiaume N-MassDOT-1901517-TrafficStudy_2020-11-20
  124. MEPA Letter-20201125
  125. response to comments of-Chessia. J__2020-12-01
  126. complete revised stormwater report-2020-12-01
  127. Response to -Tondorf-DickComments_2020-12-08
  128. Hingham Planning Board Letter
  129. Employee and Parking Variations 11.16.20
  130. Civil Peer Review 4
  131. 12.14.20PlanningBoardZoom
  132. 12.14.20PlanningBoardAudio
  133. Fire-Truck-Turning-Perfomance-Analysis-100-foot-Aerial-Platform
  134. Dec 18 Applicant email to MA DOT
  135. LT MassDOT re Proposed Last Mile Distribution Center-20201223
  136. Request to continue hearing to january 25
  137. LT MassDOT re Proposed Last Mile Distribution Center-20201223
  138. 100 Industrial Pk Rd Supplemental Traffic Review Comments 01.04.21
  139. 100 Industrial Pk Rd Supplemental Traffic Review Comments 01.04.21
  140. Town of Hingham Planning board Jan 5 2021
  141. C-RTC-SavageDunham.M-1901517-SuppEngrReview4-RTC 01.08.21
  142. C-RTC-MacDonald.O-TownOfWeymouth-1901517-PublicComments 01.08.21
  143. C-MEMO-1901517-Drainage-Test-Pit-Investigation 01.08.21
  144. 1901517-Civil Set 01.08.21
  145. 1901517 OM Manual 01.08.21
  146. C-RTC-SavageDunham M-1901517_12-14-20_PlanningBoardComments 01.11.21
  147. Traffic Study Addendum from BL Companies 1.13.21
  148. 100 Industrial Pk Rd Supplemental Traffic Review 01.19.21
  149. Chessia Review5 100 Industrial Park Rd 01.20.21
  150. Amazon proposal for Hingham SS Chamber letter
  151. RPH 100 IPR Memo 1 19 21 (003)
  152. Weymouth PD Comments 1-22-21
  153. 2021-01-22 Perry AUL Letter
  154. Public Comment DeNapoli letter
  155. Advisory Opinion 2-4-21
  156. Civil Set.02.04.21
  157. Supplemental Traffic Review.02.05.21
  158. Supplemental Engineering Review.02.05.21
  159. Supplemental Traffic Information.02.08.21
  160. 20210129 ConComm Infiltration Feasibility Ltr 02.08.21
  161. Offsite Improvement Plans.02.08.21
  162. Industrial Park Road Truck Turning Exhibit.02.08.21
  163. Proposed Development Exhibits.02.08.21
  164. Commerce Road Exhibit.02.08.21
  165. Civil Peer Review Summary of Issues 2-12-21
  166. Supplemental Traffic Review 02.15.21
  167. Memo Regarding Traffic Information Request-Peak Hour Vehicle Trips from G. Tondorf-Dick to Planning Board dated 2.22.21
  168. Letter Regarding Traffic Concerns from M. Kranzley to Planning Board dated 2.22.21
  169. Email of Opposition from D. McGonagle to Planning Board dated 2.22.21
  170. Email of Opposition from B. Stack to Planning Board dated 2.22.21
  171. Letter of Opposition from HDIC to Planning Board dated 2.24.21
  172. 3.2.21 John Chessia Engineering Review
  173. 3.3.21 John Chessia Engineering Review - Summary of Issues
  174. Land Development Plans - Civil Set 03.04.21
  175. Summary of Plan Changes 03.08.21
  176. Response to Comments from Susan Murphy 03.08.21
  177. Response to Memo from Gary Tandorf-Dick 03.08.21
  178. Response to Comments Transmittal 03.08.21
  179. Commerce Road Parking Exhibit
  180. Supplemental Traffic Review 03.09.21
  181. Letter of Concern from AW Perry to Planning Board dated 3.17.21
  182. Letter from A. Smith to Planning Board Regarding A.W. Perry Proposal dated 3.19.21
  183. Letter of Opposition from B. Cullum to Planning Board dated 3.22.21
  184. Letter with Comments and Questions from G. Crocker to Planning Board Regarding Special Permit A3 dated 3.22.21
  185. Employee and Parking Variations Chat prepared by J. Dirk dated 3.22.21
  186. Letter of Concern from P. Forman to Planning Board dated 3.22.21
  187. Letter from K. Hixon to Planning Board Regarding Summary of Project Benefits dated 3.22.21
  188. Continuation of Hearing and Extension of Decision Deadline, dated 3.22.21
  189. Letter of Concern from A. Bergsten to Planning Board dated 3.28.21
  190. Continuation of Hearing and Extension of Decision Deadline, dated 3.30.21
  191. Letter from T. Foley to Planning Board Regarding Traffic Concerns dated 3.30.21
  192. Applicant Comments to Exhibit A - Traffic Monitoring dated 4.1.21
  193. Email from J. Dirk - Draft Conditions Regarding Monitoring dated 4.2.21
  194. Letter from JEB Group to Town Administrator Regarding Infrastructure Gift dated 4.2.21
  195. Email of Opposition from D. DeNapoli to Planning Board dated 4.5.21.msg
  196. C-RPT-1901517-SWMR-2020-09-30
  197. 1901517-Civil Set-(2020-09-30)
  198. Letter Re SWPPP Review from J. Chessia to Planning Board, dated June 22, 2021