Broad Cove/North Sewer District Resilience Measures
To avoid a major shutdown of this wastewater collection system – and untreated wastewater discharges into Broad Cove and Hingham Harbor, a major ecological disaster – the Town is pursuing changes to the station and force main.
The Town of Hingham is conducting a preliminary flood vulnerability assessment to identify possible flooding scenarios and mitigation measures for the Broad Cove Pump Station and potential rehabilitation designs for the Broad Cove Force Main and the tributary gravity sewer system. Next, final protection measures will be selected based on site specific analysis of existing built structures and roadways, and the Town will seek funding to implement those measures based on the site-specific study.